FINISHING UP ONE OF OUR BIG PROJECTS

We Will Be Headed Home Soon

Author Icon David Dubois, 3/30/2023

Two of the three culverts have been completed. We are working in the last four by six-foot culvert to install the remaining 23 seals. This leg of the project is much the like previous one, but I miss the mobility of the taller culvert. The short culvert restricts our movement and speed to a degree and these joints have some loose debris that needs to be swept away before installation. Beyond that, it is more of the same, drilling, inserting anchors, expanding the bands, and trimming the anchors. We are projected to complete the entire project, 189 HydraTite seals, early April.

Looking down a long box culvert with light at the end

Beyond the job, Cody, Cameron, Ben, and I have been sharing an Airbnb. We frequently play Call Of Duty at the end of the day, which has been fun. Mardi Gras is really big down here and we got blocked in by the parade on our way back from work. It was nice to see them go by though. 

Holes drilled on either side of a pipe joint in a box-shaped pipe
Rubber being positioned over a joint in an irregularly-shaped pipe
Several technicians sitting in a box-culvert installing HydraTite over joints
HydraTite button for product page
A dark box culvert
Long dark box culvert with technicians working on the joints far in the distance
Two people working in a box culvert sitting on buckets
Expanding a retaining band in a box culvert seal
An update notification

The project is now complete and this case study details this entire project.